Newer
Older
When moving IICS assets from one org to another (most commonly from Test to Production), there are several methods that can be used, each described below.
IICS has built in functionality for the export and import of assets between organizations. Please refer to the [Informatica Knowledge Base Article](https://knowledge.informatica.com/s/article/523654?language=en_US) on the subject.
Enterprise Integration has created a tool to synchronize assets between Test and Production, located at [This Repository](https://git.doit.wisc.edu/interop/iics/iics-assets/-/tree/master). Please contact the DoIT Integration Team at [integration-platform@doit.wisc.edu](mailto:integration-platform@doit.wisc.edu) if you would like to access it.